top of page

Load Bearing Wall Removal in Toronto: Rules and Regulations

Removing a load bearing wall in Toronto is a major renovation that requires careful planning, permits, and professional oversight. If you’re considering this project, here’s what you need to know about the rules and regulations in the city.

Do You Need a Permit to Remove a Load Bearing Wall in Toronto?

Yes—removing any structural (load bearing) wall in Toronto legally requires a building permit. You must submit detailed plans, often stamped by a licensed structural engineer, to the City of Toronto before starting any demolition.

For help with engineering drawings and permits, see our structural engineering services.

Permit Application Process

1. Professional Assessment

Start by consulting a structural engineer who will:

  • Confirm whether the wall is load bearing

  • Design a suitable replacement support beam

  • Prepare the required drawings

2. Prepare Your Application

Include:

  • Engineer-stamped structural drawings

  • Detailed renovation plans

  • Contractor information (if available)

3. Submit to the City

Apply online or in person via the City of Toronto Building Permits portal.

4. Wait for Approval

The city will review your application and may ask for clarification or more details.

5. Schedule Inspections

Once approved, schedule inspections as required by your permit, usually before closing up walls.

What Happens If You Skip the Permit?

  • You may be required to undo the work at your own expense.

  • Your home insurance may become void.

  • It can delay or block the sale of your home in the future.

  • You could face fines or legal trouble.

Don’t risk it—always follow city regulations.

Toronto Building Code Considerations

  • All new beams, columns, and supports must meet Ontario Building Code standards.

  • Only licensed professionals (P. Eng) should design structural changes.

  • All work must be inspected and approved by the city.

Frequently Asked Questions

How long does the permit process take? Typically, 2–4 weeks, depending on the project complexity.

Do I need permits for non-load-bearing walls? Not always, but always double-check with the city or your engineer.

Who can help with permit drawings? Contact us for expert help preparing your documents.

More in our FAQ.

Internal Links for More Information

External Resources

Contact Candoo Engineering

Need help with wall removal permits in Toronto? Call Candoo Engineering today:

 
 
 

Comentarios


bottom of page